<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Repair Instructions Mars Series Archives - Haitian International</title>
	<atom:link href="https://vt.haitianinter.com/tutorial-category/repair-instructions-mars-series/feed/" rel="self" type="application/rss+xml" />
	<link>https://vt.haitianinter.com/tutorial-category/repair-instructions-mars-series/</link>
	<description>We Create and Extend Advantage</description>
	<lastBuildDate>Tue, 16 Jun 2026 02:43:58 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0</generator>

<image>
	<url>https://vt.haitianinter.com/wp-content/uploads/sites/3/2024/03/cropped-Favicon-Haitian-PM-32x32.png</url>
	<title>Repair Instructions Mars Series Archives - Haitian International</title>
	<link>https://vt.haitianinter.com/tutorial-category/repair-instructions-mars-series/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Instructions on how to install the guide rail and die gauge on Haitian MA series plastic injection molding machines.</title>
		<link>https://vt.haitianinter.com/tutorial/instructions-on-how-to-install-the-guide-rail-and-die-gauge-on-haitian-ma-series-plastic-injection-molding-machines/</link>
		
		<dc:creator><![CDATA[vnmarket]]></dc:creator>
		<pubDate>Wed, 10 Jun 2026 07:43:59 +0000</pubDate>
				<guid isPermaLink="false">https://vt.haitianinter.com/?post_type=tutorial&#038;p=27377</guid>

					<description><![CDATA[<p>The post <a href="https://vt.haitianinter.com/tutorial/instructions-on-how-to-install-the-guide-rail-and-die-gauge-on-haitian-ma-series-plastic-injection-molding-machines/">Instructions on how to install the guide rail and die gauge on Haitian MA series plastic injection molding machines.</a> appeared first on <a href="https://vt.haitianinter.com">Haitian International</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_0 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_0">
				<div class="et_pb_column et_pb_column_4_4 et_pb_column_0  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_0  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h3 data-path-to-node="2">1. How to reset the speaker ruler</h3>
<ul data-path-to-node="3">
<li>
<p data-path-to-node="3,0,0"><b data-path-to-node="3,0,0" data-index-in-node="0">Problem:</b> When closing the mold, the machine reports an error indicating that the guide ruler is in the wrong position.</p>
</li>
<li>
<p data-path-to-node="3,1,0"><b data-path-to-node="3,1,0" data-index-in-node="0">On-screen operations:</b></p>
<ul data-path-to-node="3,1,1">
<li>
<p data-path-to-node="3,1,1,0,0">On the home screen, press <b data-path-to-node="3,1,1,0,0" data-index-in-node="25">F10</b> , then press <b data-path-to-node="3,1,1,0,0" data-index-in-node="42">F3</b> to enter the system settings page.</p>
</li>
<li>
<p data-path-to-node="3,1,1,1,0">Enter password <b data-path-to-node="3,1,1,1,0" data-index-in-node="17">66</b></p>
</li>
<li>
<p data-path-to-node="3,1,1,2,0">Scroll down to the <b data-path-to-node="3,1,1,2,0" data-index-in-node="20">&#8220;Speaking Location&#8221;</b> section, enter the number <b data-path-to-node="3,1,1,2,0" data-index-in-node="40">1</b> , and press <b data-path-to-node="3,1,1,2,0" data-index-in-node="50">Enter (OK)</b> .</p>
</li>
<li>
<p data-path-to-node="3,1,1,3,0">The magnification value will reset to <b data-path-to-node="3,1,1,3,0" data-index-in-node="28">0.</b> Press <b data-path-to-node="3,1,1,3,0" data-index-in-node="36">F10</b> to return to the home screen and check the result.</p>
</li>
</ul>
</li>
</ul>
<h3 data-path-to-node="4">2. How to reset the mold ruler</h3>
<ul data-path-to-node="5">
<li>
<p data-path-to-node="5,0,0"><b data-path-to-node="5,0,0" data-index-in-node="0">Preparation:</b> Use the mold adjustment knob to fully close the mold.</p>
</li>
<li>
<p data-path-to-node="5,1,0"><b data-path-to-node="5,1,0" data-index-in-node="0">Problem:</b> After the mold has been fully closed, the position on the screen still doesn&#8217;t show <b data-path-to-node="5,1,0" data-index-in-node="87">0</b> (there is still an error).</p>
</li>
<li>
<p data-path-to-node="5,2,0"><b data-path-to-node="5,2,0" data-index-in-node="0">On-screen operations:</b></p>
<ul data-path-to-node="5,2,1">
<li>
<p data-path-to-node="5,2,1,0,0">Similarly, go to page <b data-path-to-node="5,2,1,0,0" data-index-in-node="20">F3</b> and enter the password <b data-path-to-node="5,2,1,0,0" data-index-in-node="38">66</b> .</p>
</li>
<li>
<p data-path-to-node="5,2,1,1,0">Scroll down to the <b data-path-to-node="5,2,1,1,0" data-index-in-node="20">Eject Position</b> section (this is the mold closing position).</p>
</li>
<li>
<p data-path-to-node="5,2,1,2,0">Select number <b data-path-to-node="5,2,1,2,0" data-index-in-node="8">1</b> and press <b data-path-to-node="5,2,1,2,0" data-index-in-node="18">Enter</b> . The ruler will automatically reset to <b data-path-to-node="5,2,1,2,0" data-index-in-node="60">0.</b></p>
</li>
<li>
<p data-path-to-node="5,2,1,3,0">Press <b data-path-to-node="5,2,1,3,0" data-index-in-node="5">F10</b> to return to the home screen to confirm that the mold closing ruler has successfully reset to 0.</p>
</li>
</ul>
</li>
</ul>
<p data-path-to-node="6">Resetting these gauges helps the machine correctly identify the origin point, thereby ensuring accurate mold opening and closing cycles and product ejection, avoiding unnecessary error warnings during operation.</p>
<p><iframe title="Cách cài đặt thước lói và thước khuôn của máy ép nhựa Haitian" width="1080" height="608" src="https://www.youtube.com/embed/9rQfyxIZuqg?feature=oembed"  allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" referrerpolicy="strict-origin-when-cross-origin" allowfullscreen></iframe></p></div>
			</div>
			</div>
				
				
				
				
			</div>
				
				
			</div>
<p>The post <a href="https://vt.haitianinter.com/tutorial/instructions-on-how-to-install-the-guide-rail-and-die-gauge-on-haitian-ma-series-plastic-injection-molding-machines/">Instructions on how to install the guide rail and die gauge on Haitian MA series plastic injection molding machines.</a> appeared first on <a href="https://vt.haitianinter.com">Haitian International</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Troubleshooting glue dispensing issues on Haitian MA series plastic injection molding machines.</title>
		<link>https://vt.haitianinter.com/tutorial/troubleshooting-glue-dispensing-issues-on-haitian-ma-series-plastic-injection-molding-machines/</link>
		
		<dc:creator><![CDATA[vnmarket]]></dc:creator>
		<pubDate>Wed, 10 Jun 2026 07:43:15 +0000</pubDate>
				<guid isPermaLink="false">https://vt.haitianinter.com/?post_type=tutorial&#038;p=27375</guid>

					<description><![CDATA[<p>There are five main reasons why glue cannot be dispensed, along with specific troubleshooting steps. 1. The safety door is not closed. Problem: The machine displays an error message during spraying if the door is not completely closed. Troubleshooting: Close the safety door completely and turn off the error message before attempting the spraying operation [&#8230;]</p>
<p>The post <a href="https://vt.haitianinter.com/tutorial/troubleshooting-glue-dispensing-issues-on-haitian-ma-series-plastic-injection-molding-machines/">Troubleshooting glue dispensing issues on Haitian MA series plastic injection molding machines.</a> appeared first on <a href="https://vt.haitianinter.com">Haitian International</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2 data-path-to-node="1">There are <b data-path-to-node="1" data-index-in-node="3">five main reasons</b> why glue cannot be dispensed, along with specific troubleshooting steps.</h2>
<h3 data-path-to-node="2">1. The safety door is not closed.</h3>
<ul data-path-to-node="3">
<li>
<p data-path-to-node="3,0,0"><b data-path-to-node="3,0,0" data-index-in-node="0">Problem:</b> The machine displays an error message during spraying if the door is not completely closed.</p>
</li>
<li>
<p data-path-to-node="3,1,0"><b data-path-to-node="3,1,0" data-index-in-node="0">Troubleshooting:</b> Close the safety door completely and turn off the error message before attempting the spraying operation again.</p>
</li>
</ul>
<h3 data-path-to-node="4">2. The injection signal is either absent or always present.</h3>
<ul data-path-to-node="5">
<li>
<p data-path-to-node="5,0,0"><b data-path-to-node="5,0,0" data-index-in-node="0">Software testing:</b> Access the <b data-path-to-node="5,0,0" data-index-in-node="34">I/O Output page (F4)&gt; F4)</b> . Check the signal pins: <b data-path-to-node="5,0,0" data-index-in-node="84">04</b> (Inject) and <b data-path-to-node="5,0,0" data-index-in-node="97">05</b> (Inject Back). Perform a manual output to test the indicator lights on the motherboard.</p>
</li>
<li>
<p data-path-to-node="5,1,0"><b data-path-to-node="5,1,0" data-index-in-node="0">Voltage check:</b> Measure the valve output signal (pin <b data-path-to-node="5,1,0" data-index-in-node="43">D100</b> for injection and <b data-path-to-node="5,1,0" data-index-in-node="60">D101</b> for reverse injection). The standard voltage must be <b data-path-to-node="5,1,0" data-index-in-node="108">24V.</b></p>
</li>
<li>
<p data-path-to-node="5,2,0"><b data-path-to-node="5,2,0" data-index-in-node="0">Switching contacts (if faulty):</b> If pin 04 is faulty, you can switch to the backup pin (e.g., pin 29) by going to page <b data-path-to-node="5,2,0" data-index-in-node="118">F6</b> and entering the password.<code data-path-to-node="5,2,0" data-index-in-node="136">1234</code> Press <b data-path-to-node="5,2,0" data-index-in-node="147">F3</b> to change the port address, then swap the corresponding signal wires on the motherboard.</p>
</li>
</ul>
<h3 data-path-to-node="6">3. Stuck fuel injector or pressure valve.</h3>
<ul data-path-to-node="7">
<li>
<p data-path-to-node="7,0,0"><b data-path-to-node="7,0,0" data-index-in-node="0">Check the coil:</b> Use a multimeter to measure the resistance between the two terminals of the coil. The normal value is approximately <b data-path-to-node="7,0,0" data-index-in-node="91">21 Ω</b> . If there is no resistance or the value is too high, the coil needs to be replaced.</p>
</li>
<li>
<p data-path-to-node="7,1,0"><b data-path-to-node="7,1,0" data-index-in-node="0">Inspect the valve body:</b> Disassemble and clean the valve. <b data-path-to-node="7,1,0" data-index-in-node="40">Note:</b> Remember the correct positions of the internal components when reassembling. If cleaning is ineffective, the valve needs to be replaced.</p>
</li>
</ul>
<h3 data-path-to-node="8">4. Low temperature or presence of foreign objects.</h3>
<ul data-path-to-node="9">
<li>
<p data-path-to-node="9,0,0"><b data-path-to-node="9,0,0" data-index-in-node="0">Temperature:</b> Check the type of plastic being used and set the appropriate temperature on page <b data-path-to-node="9,0,0" data-index-in-node="80">F8</b> . Ensure a minimum heating time (usually 10 minutes or longer depending on the type of plastic) for the plastic to melt completely.</p>
</li>
<li>
<p data-path-to-node="9,1,0"><b data-path-to-node="9,1,0" data-index-in-node="0">Foreign objects:</b> If there is an unusual noise during spraying, there may be metal or foreign objects in the screw shaft. It needs to be disassembled for cleaning and removal of the foreign objects.</p>
</li>
</ul>
<h3 data-path-to-node="10">5. Worn screw shaft or missile head assembly</h3>
<ul data-path-to-node="11">
<li>
<p data-path-to-node="11,0,0">This is due to mechanical wear and tear after prolonged use. If the above steps are ineffective, the wear should be checked and the screw shaft or rocket head assembly replaced.</p>
</li>
</ul>
<p data-path-to-node="12">If you encounter any difficulties during the process, you can contact Haitian Vietnam&#8217;s technical department directly for assistance.</p>
<p><iframe loading="lazy" title="HAITIAN(VIETNAM)- Sửa lỗi không phun được keo trên máy ép nhựa Haitian" width="1080" height="608" src="https://www.youtube.com/embed/ZSCNN8U4rMg?feature=oembed"  allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" referrerpolicy="strict-origin-when-cross-origin" allowfullscreen></iframe></p>
<div class="attachment-container youtube"></div>
<p>&nbsp;</p>
<p>The post <a href="https://vt.haitianinter.com/tutorial/troubleshooting-glue-dispensing-issues-on-haitian-ma-series-plastic-injection-molding-machines/">Troubleshooting glue dispensing issues on Haitian MA series plastic injection molding machines.</a> appeared first on <a href="https://vt.haitianinter.com">Haitian International</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Troubleshooting material feeding issues on Haitian MA series plastic injection molding machines.</title>
		<link>https://vt.haitianinter.com/tutorial/troubleshooting-material-feeding-issues-on-haitian-ma-series-plastic-injection-molding-machines/</link>
		
		<dc:creator><![CDATA[vnmarket]]></dc:creator>
		<pubDate>Wed, 10 Jun 2026 07:42:26 +0000</pubDate>
				<guid isPermaLink="false">https://vt.haitianinter.com/?post_type=tutorial&#038;p=27373</guid>

					<description><![CDATA[<p>There are six main causes and corresponding solutions as follows: 1. The safety door is not closed. Problem: The machine displays an error message on the screen during the material loading process. Procedure: Check and completely close the safety door before loading. 2. Fueling signal is malfunctioning. Test: Go to the I/O Output page (F4) [&#8230;]</p>
<p>The post <a href="https://vt.haitianinter.com/tutorial/troubleshooting-material-feeding-issues-on-haitian-ma-series-plastic-injection-molding-machines/">Troubleshooting material feeding issues on Haitian MA series plastic injection molding machines.</a> appeared first on <a href="https://vt.haitianinter.com">Haitian International</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2 data-path-to-node="1">There are <b data-path-to-node="1" data-index-in-node="3">six main causes</b> and corresponding solutions as follows:</h2>
<h3 data-path-to-node="2">1. The safety door is not closed.</h3>
<ul data-path-to-node="3">
<li>
<p data-path-to-node="3,0,0"><b data-path-to-node="3,0,0" data-index-in-node="0">Problem:</b> The machine displays an error message on the screen during the material loading process.</p>
</li>
<li>
<p data-path-to-node="3,1,0"><b data-path-to-node="3,1,0" data-index-in-node="0">Procedure:</b> Check and completely close the safety door before loading.</p>
</li>
</ul>
<h3 data-path-to-node="4">2. Fueling signal is malfunctioning.</h3>
<ul data-path-to-node="5">
<li>
<p data-path-to-node="5,0,0"><b data-path-to-node="5,0,0" data-index-in-node="0">Test:</b> Go to the <b data-path-to-node="5,0,0" data-index-in-node="20">I/O Output page (F4)</b> to manually test the feed signal (usually point <b data-path-to-node="5,0,0" data-index-in-node="96">06</b> ).</p>
</li>
<li>
<p data-path-to-node="5,1,0"><b data-path-to-node="5,1,0" data-index-in-node="0">Troubleshooting:</b> If node 06 is faulty (no signal or always outputs a signal), switch to an unused node (e.g., node 29):</p>
<ul data-path-to-node="5,1,1">
<li>
<p data-path-to-node="5,1,1,0,0">Go to page <b data-path-to-node="5,1,1,0,0" data-index-in-node="10">F6</b> , enter your password.<code data-path-to-node="5,1,1,0,0" data-index-in-node="28">1234</code> , select <b data-path-to-node="5,1,1,0,0" data-index-in-node="39">F3</b> to change the node number (Original: 6, New: 29).</p>
</li>
<li>
<p data-path-to-node="5,1,1,1,0">Next, swap the corresponding signal wires at the electrical panel (motherboard).</p>
</li>
<li>
<p data-path-to-node="5,1,1,2,0">Check that the power supply to the valve is at least <b data-path-to-node="5,1,1,2,0" data-index-in-node="43">24V</b> .</p>
</li>
</ul>
</li>
</ul>
<h3 data-path-to-node="6">3. Stuck fuel intake valve or pressure valve.</h3>
<ul data-path-to-node="7">
<li>
<p data-path-to-node="7,0,0"><b data-path-to-node="7,0,0" data-index-in-node="0">Check the coil:</b> Use a multimeter to measure the resistance between the two terminals of the coil. The normal value is approximately <b data-path-to-node="7,0,0" data-index-in-node="91">21 Ω</b> . If there is no resistance or the resistance is too high, the coil needs to be replaced.</p>
</li>
<li>
<p data-path-to-node="7,1,0"><b data-path-to-node="7,1,0" data-index-in-node="0">Inspect the valve body:</b> Disassemble and clean the valve body thoroughly. If it still doesn&#8217;t work after cleaning, the valve must be replaced.</p>
</li>
</ul>
<h3 data-path-to-node="8">4. Low temperature or foreign object in the barrel.</h3>
<ul data-path-to-node="9">
<li>
<p data-path-to-node="9,0,0"><b data-path-to-node="9,0,0" data-index-in-node="0">Temperature:</b> Check the type of plastic being used and reset the melting temperature accordingly. On page <b data-path-to-node="9,0,0" data-index-in-node="92">F8</b> , you can adjust the heating time (usually 10-30 minutes).</p>
</li>
<li>
<p data-path-to-node="9,1,0"><b data-path-to-node="9,1,0" data-index-in-node="0">Foreign object:</b> If there is an unusual noise coming from the puller barrel, there may be metal or a foreign object inside. It needs to be disassembled for cleaning and removal of the foreign object.</p>
</li>
</ul>
<h3 data-path-to-node="10">5. Clogged funnel neck or worn screw shaft.</h3>
<ul data-path-to-node="11">
<li>
<p data-path-to-node="11,0,0"><b data-path-to-node="11,0,0" data-index-in-node="0">Clogged funnel neck:</b> The screw rotates but cannot extract the adhesive because the resin is stuck in the funnel neck. The solution is to clean and unclog the funnel.</p>
</li>
<li>
<p data-path-to-node="11,1,0"><b data-path-to-node="11,1,0" data-index-in-node="0">Worn screw:</b> The resin has seeped through but the sealant isn&#8217;t taking hold. The screw wear needs to be checked and replaced if necessary.</p>
</li>
</ul>
<h3 data-path-to-node="12">6. Motor or feeder failure</h3>
<ul data-path-to-node="13">
<li>
<p data-path-to-node="13,0,0"><b data-path-to-node="13,0,0" data-index-in-node="0">Symptom:</b> There is an unusual noise coming from the base or the 5-star motor.</p>
</li>
<li>
<p data-path-to-node="13,1,0"><b data-path-to-node="13,1,0" data-index-in-node="0">Troubleshooting:</b> Disassemble, inspect, identify the faulty internal components, and proceed with replacement.</p>
</li>
</ul>
<p data-path-to-node="14">If the above steps don&#8217;t resolve the issue, you should contact Haitian&#8217;s technical support department for more in-depth assistance.</p>
<p><iframe loading="lazy" title="HAITIAN(VIETNAM)- Sửa lỗi không nạp được liệu trên máy ép nhựa Haitian" width="1080" height="608" src="https://www.youtube.com/embed/5i4HiNh9KfQ?feature=oembed"  allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" referrerpolicy="strict-origin-when-cross-origin" allowfullscreen></iframe></p>
<p>The post <a href="https://vt.haitianinter.com/tutorial/troubleshooting-material-feeding-issues-on-haitian-ma-series-plastic-injection-molding-machines/">Troubleshooting material feeding issues on Haitian MA series plastic injection molding machines.</a> appeared first on <a href="https://vt.haitianinter.com">Haitian International</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Troubleshooting Haitian injection molding machine error: no heating signal in section 4.</title>
		<link>https://vt.haitianinter.com/tutorial/instructions-for-replacing-the-screw-on-haitian-ma-series-plastic-injection-molding-machines/</link>
		
		<dc:creator><![CDATA[vnmarket]]></dc:creator>
		<pubDate>Wed, 10 Jun 2026 07:26:56 +0000</pubDate>
				<guid isPermaLink="false">https://vt.haitianinter.com/?post_type=tutorial&#038;p=27370</guid>

					<description><![CDATA[<p>1. Remove and inspect the control board. Open the electrical cabinet: Open the protective box and disconnect the signal connectors attached to the AK668 (or equivalent) circuit board. Cleaning: Use a brush and compressed air to remove dust and dirt from the circuit board before in-depth testing. 2. Circuit board repair process Identify the faulty [&#8230;]</p>
<p>The post <a href="https://vt.haitianinter.com/tutorial/instructions-for-replacing-the-screw-on-haitian-ma-series-plastic-injection-molding-machines/">Troubleshooting Haitian injection molding machine error: no heating signal in section 4.</a> appeared first on <a href="https://vt.haitianinter.com">Haitian International</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h3 data-path-to-node="1">1. Remove and inspect the control board.</h3>
<ul data-path-to-node="2">
<li>
<p data-path-to-node="2,0,0"><b data-path-to-node="2,0,0" data-index-in-node="0">Open the electrical cabinet:</b> Open the protective box and disconnect the signal connectors attached to the <b data-path-to-node="2,0,0" data-index-in-node="81">AK668</b> (or equivalent) circuit board.</p>
</li>
<li>
<p data-path-to-node="2,1,0"><b data-path-to-node="2,1,0" data-index-in-node="0">Cleaning:</b> Use a brush and compressed air to remove dust and dirt from the circuit board before in-depth testing.</p>
</li>
</ul>
<h3 data-path-to-node="3">2. Circuit board repair process</h3>
<ul data-path-to-node="4">
<li>
<p data-path-to-node="4,0,0"><b data-path-to-node="4,0,0" data-index-in-node="0">Identify the faulty component:</b> Measure and test the output signal control system for heating section 4. The fault is usually in the small signal switching components on the circuit.</p>
</li>
<li>
<p data-path-to-node="4,1,0"><b data-path-to-node="4,1,0" data-index-in-node="0">Replacing components:</b> * Use a heat gun and soldering iron to remove the damaged component.</p>
<ul data-path-to-node="4,1,1">
<li>
<p data-path-to-node="4,1,1,0,0">Clean the solder joints thoroughly using flux or specialized circuit cleaning fluid.</p>
</li>
<li>
<p data-path-to-node="4,1,1,1,0">Solder the new components into the correct positions, ensuring a secure solder joint with no short circuits.</p>
</li>
</ul>
</li>
</ul>
<h3 data-path-to-node="5">3. Install and reconnect.</h3>
<ul data-path-to-node="6">
<li>
<p data-path-to-node="6,0,0"><b data-path-to-node="6,0,0" data-index-in-node="0">Installing the circuit board:</b> Place the circuit board back in its original position and tighten the retaining screws.</p>
</li>
<li>
<p data-path-to-node="6,1,0"><b data-path-to-node="6,1,0" data-index-in-node="0">Wiring:</b> Reconnect all signal jacks. Pay particular attention to checking the heating control signal wires (section 4) to ensure good contact.</p>
</li>
</ul>
<h3 data-path-to-node="7">4. Operational testing</h3>
<ul data-path-to-node="8">
<li>
<p data-path-to-node="8,0,0">Turn on the machine and observe the display on the control panel.</p>
</li>
<li>
<p data-path-to-node="8,1,0">Check the signal output status at the heating page. If the error has been corrected, the temperature of section 4 will begin to rise and display a normal operating status.</p>
</li>
</ul>
<p data-path-to-node="9">Repairing circuit boards requires precise soldering skills. If you are not confident, you should contact the technical department for professional replacement or repair assistance.</p>
<p><iframe loading="lazy" title="XỬ LÝ LỖI KHÔNG XUẤT TÍN HIỆU GIA NHIỆT ĐOẠN 4 TRÊN MÁY ÉP NHỰA HAITIAN" width="1080" height="608" src="https://www.youtube.com/embed/B4K-kvR1FUQ?feature=oembed"  allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" referrerpolicy="strict-origin-when-cross-origin" allowfullscreen></iframe></p>
<p>The post <a href="https://vt.haitianinter.com/tutorial/instructions-for-replacing-the-screw-on-haitian-ma-series-plastic-injection-molding-machines/">Troubleshooting Haitian injection molding machine error: no heating signal in section 4.</a> appeared first on <a href="https://vt.haitianinter.com">Haitian International</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Important Steps to Protect Haitian Injection Molding Machines During Shutdown</title>
		<link>https://vt.haitianinter.com/tutorial/important-steps-to-protect-haitian-injection-molding-machines-during-shutdown/</link>
		
		<dc:creator><![CDATA[vnmarket]]></dc:creator>
		<pubDate>Wed, 10 Jun 2026 07:26:09 +0000</pubDate>
				<guid isPermaLink="false">https://vt.haitianinter.com/?post_type=tutorial&#038;p=27367</guid>

					<description><![CDATA[<p>1. Maintain the mold and clamping system. Moldless machine: Clean the jaw surface thoroughly and apply anti-rust oil to protect the metal surface. The machine is currently clamped: Clean the mold and perform mold closing at low pressure (do not use high pressure). This helps avoid jamming of the clamps or difficulty in opening the [&#8230;]</p>
<p>The post <a href="https://vt.haitianinter.com/tutorial/important-steps-to-protect-haitian-injection-molding-machines-during-shutdown/">Important Steps to Protect Haitian Injection Molding Machines During Shutdown</a> appeared first on <a href="https://vt.haitianinter.com">Haitian International</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h3 data-path-to-node="2">1. Maintain the mold and clamping system.</h3>
<ul data-path-to-node="3">
<li>
<p data-path-to-node="3,0,0"><b data-path-to-node="3,0,0" data-index-in-node="0">Moldless machine:</b> Clean the jaw surface thoroughly and apply anti-rust oil to protect the metal surface.</p>
</li>
<li>
<p data-path-to-node="3,1,0"><b data-path-to-node="3,1,0" data-index-in-node="0">The machine is currently clamped:</b> Clean the mold and perform mold closing at <b data-path-to-node="3,1,0" data-index-in-node="59">low pressure</b> (do not use high pressure). This helps avoid jamming of the clamps or difficulty in opening the mold after a long period of inactivity.</p>
</li>
</ul>
<h3 data-path-to-node="4">2. Clean the puller barrel and screw shaft.</h3>
<ul data-path-to-node="5">
<li>
<p data-path-to-node="5,0,0"><b data-path-to-node="5,0,0" data-index-in-node="0">Cleaning the plastic:</b> Use PP or PS plastic scraper to clean the barrel, pushing out any remaining raw materials or flammable plastic inside.</p>
</li>
<li>
<p data-path-to-node="5,1,0"><b data-path-to-node="5,1,0" data-index-in-node="0">Screw position:</b> After cleaning, <b data-path-to-node="5,1,0" data-index-in-node="39">move the screw back to its maximum position</b> . This helps prevent any remaining plastic from burning during the next heating cycle.</p>
</li>
<li>
<p data-path-to-node="5,2,0"><b data-path-to-node="5,2,0" data-index-in-node="0">Cooling system:</b> Close the coolant valve on the puller barrel and use an air hose to clean out any accumulated water.</p>
</li>
</ul>
<h3 data-path-to-node="6">3. General cleaning and cleaning of electrical cabinets.</h3>
<ul data-path-to-node="7">
<li>
<p data-path-to-node="7,0,0"><b data-path-to-node="7,0,0" data-index-in-node="0">Cleaning the machine body:</b> Wipe away any dust, dirt, and grease adhering to the machine body.</p>
</li>
<li>
<p data-path-to-node="7,1,0"><b data-path-to-node="7,1,0" data-index-in-node="0">Safe cleaning of electrical cabinets:</b></p>
<ul data-path-to-node="7,1,1">
<li>
<p data-path-to-node="7,1,1,0,0"><b data-path-to-node="7,1,1,0,0" data-index-in-node="0">Turn off the power and wait 15 minutes</b> before opening the electrical cabinet to ensure that the electronic components have discharged completely, thus ensuring the safety of the circuit.</p>
</li>
<li>
<p data-path-to-node="7,1,1,1,0">Use a dry cloth to wipe away dust and use an air blower to remove dust from hard-to-reach areas.</p>
</li>
<li>
<p data-path-to-node="7,1,1,2,0"><b data-path-to-node="7,1,1,2,0" data-index-in-node="0">Moisture and insect protection:</b> Place additional desiccant bags and seal the electrical cabinet tightly to prevent component oxidation or damage to wiring caused by rodents.</p>
</li>
</ul>
</li>
</ul>
<h3 data-path-to-node="8">4. Conclusion</h3>
<ul data-path-to-node="9">
<li>
<p data-path-to-node="9,0,0">After completing the above steps, proceed to turn off the main circuit breaker (CB) of the machine to completely cut off the power.</p>
</li>
</ul>
<p data-path-to-node="10">Following this procedure correctly will help keep the machine in optimal condition and ready to resume operation whenever needed.</p>
<p><iframe loading="lazy" title="MỘT SỐ ĐIỀU CẦN LÀM ĐỂ BẢO VỆ MÁY ÉP NHỰA TRƯỚC KHI TẮT MÁY - HAITIAN VIỆT NAM" width="1080" height="608" src="https://www.youtube.com/embed/0hYUXqNIuOM?feature=oembed"  allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" referrerpolicy="strict-origin-when-cross-origin" allowfullscreen></iframe></p>
<p>The post <a href="https://vt.haitianinter.com/tutorial/important-steps-to-protect-haitian-injection-molding-machines-during-shutdown/">Important Steps to Protect Haitian Injection Molding Machines During Shutdown</a> appeared first on <a href="https://vt.haitianinter.com">Haitian International</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Instructions for opening a Haitian plastic injection molding machine after a long period of production shutdown.</title>
		<link>https://vt.haitianinter.com/tutorial/instructions-for-opening-a-haitian-plastic-injection-molding-machine-after-a-long-period-of-production-shutdown/</link>
		
		<dc:creator><![CDATA[vnmarket]]></dc:creator>
		<pubDate>Wed, 10 Jun 2026 07:23:28 +0000</pubDate>
				<guid isPermaLink="false">https://vt.haitianinter.com/?post_type=tutorial&#038;p=27365</guid>

					<description><![CDATA[<p>Step 1: Check the power cord and contacts. Mechanical inspection: Examine the bolted connections of the phase wire, neutral wire, and especially the ground wire (PE) to ensure they are secure. Continuity testing: Use a multimeter to check the continuity of the system. Insulation test: Inspect the motor at the inverter by measuring the voltage, [&#8230;]</p>
<p>The post <a href="https://vt.haitianinter.com/tutorial/instructions-for-opening-a-haitian-plastic-injection-molding-machine-after-a-long-period-of-production-shutdown/">Instructions for opening a Haitian plastic injection molding machine after a long period of production shutdown.</a> appeared first on <a href="https://vt.haitianinter.com">Haitian International</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h3 data-path-to-node="2">Step 1: Check the power cord and contacts.</h3>
<ul data-path-to-node="3">
<li>
<p data-path-to-node="3,0,0"><b data-path-to-node="3,0,0" data-index-in-node="0">Mechanical inspection:</b> Examine the bolted connections of the phase wire, neutral wire, and especially the ground wire (PE) to ensure they are secure.</p>
</li>
<li>
<p data-path-to-node="3,1,0"><b data-path-to-node="3,1,0" data-index-in-node="0">Continuity testing:</b> Use a multimeter to check the continuity of the system.</p>
</li>
<li>
<p data-path-to-node="3,2,0"><b data-path-to-node="3,2,0" data-index-in-node="0">Insulation test:</b> Inspect the motor at the inverter by measuring the voltage, voltage, and current (U, V, W) between the U, V, and W wires, and each wire against ground to ensure there is no short circuit to the casing.</p>
</li>
</ul>
<h3 data-path-to-node="4">Step 2: Turn on the power switch and check the parameters.</h3>
<ul data-path-to-node="5">
<li>
<p data-path-to-node="5,0,0"><b data-path-to-node="5,0,0" data-index-in-node="0">Protection check:</b> Check the condition of the circuit breakers (CPs) or fuses that protect the heating element.</p>
</li>
<li>
<p data-path-to-node="5,1,0"><b data-path-to-node="5,1,0" data-index-in-node="0">Voltage specifications:</b> Before switching on the main power, measure the voltage to ensure that the voltage between the phase wires is <b data-path-to-node="5,1,0" data-index-in-node="82">380V</b> and the voltage between the phase wires and the neutral wire is <b data-path-to-node="5,1,0" data-index-in-node="120">220V</b> .</p>
</li>
<li>
<p data-path-to-node="5,2,0"><b data-path-to-node="5,2,0" data-index-in-node="0">Screen startup:</b> After closing the CP, observe the startup screen. If there are any error warnings, address them immediately. Ensure that the electronic gauges are displayed stably.</p>
</li>
</ul>
<h3 data-path-to-node="6">Step 3: Check the heating system.</h3>
<ul data-path-to-node="7">
<li>
<p data-path-to-node="7,0,0"><b data-path-to-node="7,0,0" data-index-in-node="0">Temperature setting:</b> Set the temperature appropriate for the type of plastic being used.</p>
</li>
<li>
<p data-path-to-node="7,1,0"><b data-path-to-node="7,1,0" data-index-in-node="0">Important note:</b> After the screw barrel reaches the set temperature, <b data-path-to-node="7,1,0" data-index-in-node="57">it must be kept at that temperature for at least 30 minutes</b> before operation. This allows the plastic to melt completely, reduces internal friction, and protects the lifespan of the screw shaft.</p>
</li>
</ul>
<h3 data-path-to-node="8">Step 4: Check operating conditions</h3>
<ul data-path-to-node="9">
<li>
<p data-path-to-node="9,0,0">Check the safety conditions around the machine before starting it.</p>
</li>
<li>
<p data-path-to-node="9,1,0">Inspect the hydraulic oil system, lubrication oil level, and coolant system.</p>
</li>
</ul>
<h3 data-path-to-node="10">Steps 5 &amp; 6: Manual operation and final check</h3>
<ul data-path-to-node="11">
<li>
<p data-path-to-node="11,0,0">Perform the operations in manual mode to check the movements of the mold, screw, and jig for smoothness or any unusual noises.</p>
</li>
<li>
<p data-path-to-node="11,1,0">Check all other technical conditions before switching to automatic operation mode.</p>
</li>
</ul>
<p><iframe loading="lazy" title="HƯỚNG DẪN MỞ MÁY ÉP NHỰA HAITIAN SAU THỜI GIAN DỪNG SẢN XUẤT - HAITIAN VIETNAM" width="1080" height="608" src="https://www.youtube.com/embed/s3klPHtso6k?feature=oembed"  allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" referrerpolicy="strict-origin-when-cross-origin" allowfullscreen></iframe></p>
<p>The post <a href="https://vt.haitianinter.com/tutorial/instructions-for-opening-a-haitian-plastic-injection-molding-machine-after-a-long-period-of-production-shutdown/">Instructions for opening a Haitian plastic injection molding machine after a long period of production shutdown.</a> appeared first on <a href="https://vt.haitianinter.com">Haitian International</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Instructions on adjusting the clearance between the screw shaft and the barrel on the Haitian MA series machines.</title>
		<link>https://vt.haitianinter.com/tutorial/instructions-on-adjusting-the-clearance-between-the-screw-shaft-and-the-barrel-on-the-haitian-ma-series-machines/</link>
		
		<dc:creator><![CDATA[vnmarket]]></dc:creator>
		<pubDate>Wed, 10 Jun 2026 07:18:38 +0000</pubDate>
				<guid isPermaLink="false">https://vt.haitianinter.com/?post_type=tutorial&#038;p=27363</guid>

					<description><![CDATA[<p>1. Causes of the noise Impurities or iron particles get inside the puller barrel. The problem stems from the raw materials. The clearance between the screw shaft and the puller barrel is not up to standard due to geometric or installation errors. 2. Points to check and address Balance: Check and remeasure the balance of [&#8230;]</p>
<p>The post <a href="https://vt.haitianinter.com/tutorial/instructions-on-adjusting-the-clearance-between-the-screw-shaft-and-the-barrel-on-the-haitian-ma-series-machines/">Instructions on adjusting the clearance between the screw shaft and the barrel on the Haitian MA series machines.</a> appeared first on <a href="https://vt.haitianinter.com">Haitian International</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h3 data-path-to-node="2">1. Causes of the noise</h3>
<ul data-path-to-node="3">
<li>
<p data-path-to-node="3,0,0">Impurities or iron particles get inside the puller barrel.</p>
</li>
<li>
<p data-path-to-node="3,1,0">The problem stems from the raw materials.</p>
</li>
<li>
<p data-path-to-node="3,2,0">The clearance between the screw shaft and the puller barrel is not up to standard due to geometric or installation errors.</p>
</li>
</ul>
<h3 data-path-to-node="4">2. Points to check and address</h3>
<ul data-path-to-node="5">
<li>
<p data-path-to-node="5,0,0"><b data-path-to-node="5,0,0" data-index-in-node="0">Balance:</b> Check and remeasure the balance of the machine body.</p>
</li>
<li>
<p data-path-to-node="5,1,0"><b data-path-to-node="5,1,0" data-index-in-node="0">Barrel play:</b> Check if the barrel is tilting downwards due to improper installation.</p>
</li>
<li>
<p data-path-to-node="5,2,0"><b data-path-to-node="5,2,0" data-index-in-node="0">Cooling system:</b> Ensure the cooling system nuts are tightened securely.</p>
</li>
<li>
<p data-path-to-node="5,3,0"><b data-path-to-node="5,3,0" data-index-in-node="0">Concentricity of the coupling:</b> Check the concentricity of the coupling, ensuring it does not exceed the permissible standard.</p>
</li>
<li>
<p data-path-to-node="5,4,0"><b data-path-to-node="5,4,0" data-index-in-node="0">Drying time:</b> Ensure a minimum cold start resistance time of 30 minutes when heating the puller barrel.</p>
</li>
<li>
<p data-path-to-node="5,5,0"><b data-path-to-node="5,5,0" data-index-in-node="0">Guide rails:</b> Check the straightness and proper installation of the guide rails.</p>
</li>
</ul>
<h3 data-path-to-node="6">3. Technical adjustment process</h3>
<ul data-path-to-node="7">
<li>
<p data-path-to-node="7,0,0"><b data-path-to-node="7,0,0" data-index-in-node="0">Using a feeler gauge:</b> Use a <b data-path-to-node="7,0,0" data-index-in-node="37">0.02 mm</b> feeler gauge to check the narrowest points between the outer diameter of the screw shaft and the inner hole of the puller barrel (at 8 points on the support).</p>
</li>
<li>
<p data-path-to-node="7,1,0"><b data-path-to-node="7,1,0" data-index-in-node="0">Adjusting the rear support:</b> * If the gap at the two lower left corners is small: Loosen the corresponding screws and adjust to press down or lift up.</p>
<ul data-path-to-node="7,1,1">
<li>
<p data-path-to-node="7,1,1,0,0">The typical adjustment range is between <b data-path-to-node="7,1,1,0,0" data-index-in-node="49">1.0 mm and 1.5 mm</b> .</p>
</li>
</ul>
</li>
<li>
<p data-path-to-node="7,2,0"><b data-path-to-node="7,2,0" data-index-in-node="0">Concentricity measurement:</b> Use a center gauge to remeasure the concentricity of the frame and the puller barrel; the inherent error should be within <b data-path-to-node="7,2,0" data-index-in-node="123">0.30 mm</b> .</p>
</li>
</ul>
<h3 data-path-to-node="8">4. Post-adjustment check</h3>
<ul data-path-to-node="9">
<li>
<p data-path-to-node="9,0,0">After making adjustments, conduct a test run of the system and spray at a slow speed.</p>
</li>
<li>
<p data-path-to-node="9,1,0">Ensure the machine runs smoothly and there are no unusual noises coming from the screw assembly.</p>
</li>
</ul>
<p data-path-to-node="10">If users encounter any difficulties during the process, they can contact Haitian Vietnam&#8217;s technical hotline for direct support.</p>
<p><iframe loading="lazy" title="Hướng dẫn điều chỉnh khe hở giữa trục vít và nòng cảo - Haitian Vietnam" width="1080" height="608" src="https://www.youtube.com/embed/u60dPbvcUyg?feature=oembed"  allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" referrerpolicy="strict-origin-when-cross-origin" allowfullscreen></iframe></p>
<p>The post <a href="https://vt.haitianinter.com/tutorial/instructions-on-adjusting-the-clearance-between-the-screw-shaft-and-the-barrel-on-the-haitian-ma-series-machines/">Instructions on adjusting the clearance between the screw shaft and the barrel on the Haitian MA series machines.</a> appeared first on <a href="https://vt.haitianinter.com">Haitian International</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Instructions for rotating the die and changing the screw on the Haitian MA series plastic injection molding machine.</title>
		<link>https://vt.haitianinter.com/tutorial/instructions-for-rotating-the-die-and-changing-the-screw-on-the-haitian-ma-series-plastic-injection-molding-machine/</link>
		
		<dc:creator><![CDATA[vnmarket]]></dc:creator>
		<pubDate>Wed, 10 Jun 2026 07:17:38 +0000</pubDate>
				<guid isPermaLink="false">https://vt.haitianinter.com/?post_type=tutorial&#038;p=27361</guid>

					<description><![CDATA[<p>1. Rotate the stage. Preparation: Move the scaffolding back to its final position. Disassembly: Remove the plastic protective caps and hexagonal screws on the rail. Secure the batten bar: Attach the batten bar to the rail and move the scaffolding close to the batten bar to secure its position. Disconnect: Remove the protective cover, sensor, [&#8230;]</p>
<p>The post <a href="https://vt.haitianinter.com/tutorial/instructions-for-rotating-the-die-and-changing-the-screw-on-the-haitian-ma-series-plastic-injection-molding-machine/">Instructions for rotating the die and changing the screw on the Haitian MA series plastic injection molding machine.</a> appeared first on <a href="https://vt.haitianinter.com">Haitian International</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h3 data-path-to-node="1">1. Rotate the stage.</h3>
<ul data-path-to-node="2">
<li>
<p data-path-to-node="2,0,0"><b data-path-to-node="2,0,0" data-index-in-node="0">Preparation:</b> Move the scaffolding back to its final position.</p>
</li>
<li>
<p data-path-to-node="2,1,0"><b data-path-to-node="2,1,0" data-index-in-node="0">Disassembly:</b> Remove the plastic protective caps and hexagonal screws on the rail.</p>
</li>
<li>
<p data-path-to-node="2,2,0"><b data-path-to-node="2,2,0" data-index-in-node="0">Secure the batten bar:</b> Attach the batten bar to the rail and move the scaffolding close to the batten bar to secure its position.</p>
</li>
<li>
<p data-path-to-node="2,3,0"><b data-path-to-node="2,3,0" data-index-in-node="0">Disconnect:</b> Remove the protective cover, sensor, and the screws securing the drum and cylinder.</p>
</li>
<li>
<p data-path-to-node="2,4,0"><b data-path-to-node="2,4,0" data-index-in-node="0">Operation:</b> Turn on the rotating truss function on the control panel and press the button to rotate.</p>
</li>
</ul>
<h3 data-path-to-node="3">2. Replace the screw shaft.</h3>
<ul data-path-to-node="4">
<li>
<p data-path-to-node="4,0,0"><b data-path-to-node="4,0,0" data-index-in-node="0">Heat preparation:</b> Turn off heating elements 1 and 2, wait for it to cool down, then remove the heating ring.</p>
</li>
<li>
<p data-path-to-node="4,1,0"><b data-path-to-node="4,1,0" data-index-in-node="0">Removing the screw shaft:</b> Remove the flange bolts in sequence, then remove the screw shaft tail and pull the screw shaft out.</p>
</li>
<li>
<p data-path-to-node="4,2,0"><b data-path-to-node="4,2,0" data-index-in-node="0">Installing a new screw shaft:</b> Thoroughly clean and apply heat-resistant copper grease to the threaded ends. Then reassemble the flange, heating ring, and secure the mounting bracket.</p>
</li>
</ul>
<h3 data-path-to-node="5">3. Center the spray nozzle.</h3>
<ul data-path-to-node="6">
<li>
<p data-path-to-node="6,0,0">Use calipers or a specialized measuring device to check the concentricity between the nozzle and the mold center hole.</p>
</li>
<li>
<p data-path-to-node="6,1,0">Adjust the alignment bolts at the base of the truss until the required accuracy is achieved.</p>
</li>
</ul>
<p data-path-to-node="7"><b data-path-to-node="7" data-index-in-node="0">Note:</b> Always ensure workplace safety, wear heat-resistant gloves, and disconnect the power supply when necessary during maintenance.</p>
<p><iframe loading="lazy" title="Hướng dẫn xoay giàn đài thay trục vít - Haitian Vietnam" width="1080" height="608" src="https://www.youtube.com/embed/NFXjWPZXj48?feature=oembed"  allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" referrerpolicy="strict-origin-when-cross-origin" allowfullscreen></iframe></p>
<p>The post <a href="https://vt.haitianinter.com/tutorial/instructions-for-rotating-the-die-and-changing-the-screw-on-the-haitian-ma-series-plastic-injection-molding-machine/">Instructions for rotating the die and changing the screw on the Haitian MA series plastic injection molding machine.</a> appeared first on <a href="https://vt.haitianinter.com">Haitian International</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Instructions for installing the screw shaft into the barrel of the Haitian MA series puller.</title>
		<link>https://vt.haitianinter.com/tutorial/instructions-for-installing-the-screw-shaft-into-the-barrel-of-the-haitian-ma-series-puller/</link>
		
		<dc:creator><![CDATA[vnmarket]]></dc:creator>
		<pubDate>Wed, 10 Jun 2026 07:16:40 +0000</pubDate>
				<guid isPermaLink="false">https://vt.haitianinter.com/?post_type=tutorial&#038;p=27359</guid>

					<description><![CDATA[<p>1. Prepare the components. The parts that need to be prepared include: Screw and Barrel. Screw tip, collar seat, screw collar. Nozzle, Front Barrel. Hexagon bolts, hexagon plugs, and heat-resistant grease. 2. Install the three-piece screw head assembly. Assembly order: Assemble the push ring, retaining ring, and screw head together. Important note: The collar seat [&#8230;]</p>
<p>The post <a href="https://vt.haitianinter.com/tutorial/instructions-for-installing-the-screw-shaft-into-the-barrel-of-the-haitian-ma-series-puller/">Instructions for installing the screw shaft into the barrel of the Haitian MA series puller.</a> appeared first on <a href="https://vt.haitianinter.com">Haitian International</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h3 data-path-to-node="1">1. Prepare the components.</h3>
<p data-path-to-node="2">The parts that need to be prepared include:</p>
<ul data-path-to-node="3">
<li>
<p data-path-to-node="3,0,0">Screw and Barrel.</p>
</li>
<li>
<p data-path-to-node="3,1,0">Screw tip, collar seat, screw collar.</p>
</li>
<li>
<p data-path-to-node="3,2,0">Nozzle, Front Barrel.</p>
</li>
<li>
<p data-path-to-node="3,3,0">Hexagon bolts, hexagon plugs, and heat-resistant grease.</p>
</li>
</ul>
<h3 data-path-to-node="4">2. Install the three-piece screw head assembly.</h3>
<ul data-path-to-node="5">
<li>
<p data-path-to-node="5,0,0"><b data-path-to-node="5,0,0" data-index-in-node="0">Assembly order:</b> Assemble the push ring, retaining ring, and screw head together.</p>
</li>
<li>
<p data-path-to-node="5,1,0"><b data-path-to-node="5,1,0" data-index-in-node="0">Important note:</b> The collar seat must be installed correctly to ensure a tight seal and prevent backflow. There are two standards: standard (angled) and flat, depending on the type of machine.</p>
</li>
</ul>
<h3 data-path-to-node="6">3. Install the screw input assembly.</h3>
<ul data-path-to-node="7">
<li>
<p data-path-to-node="7,0,0">Apply heat-resistant grease to the threads of the screw head.</p>
</li>
<li>
<p data-path-to-node="7,1,0">Screw the head assembly onto the <b data-path-to-node="7,1,0" data-index-in-node="30">screw shaft counterclockwise</b> and tighten with a specialized wrench.</p>
</li>
</ul>
<h3 data-path-to-node="8">4. Install the auxiliary parts on the puller barrel.</h3>
<ul data-path-to-node="9">
<li>
<p data-path-to-node="9,0,0">Wrap heat-resistant Teflon tape around the hexagonal plugs and insert them into the holes on the puller barrel.</p>
</li>
<li>
<p data-path-to-node="9,1,0">Clean the contact surfaces between the drumstick and the drumstick cutting board thoroughly.</p>
</li>
<li>
<p data-path-to-node="9,2,0">Apply high-temperature grease to all flange tightening bolts.</p>
</li>
</ul>
<h3 data-path-to-node="10">5. Install the front barrel.</h3>
<ul data-path-to-node="11">
<li>
<p data-path-to-node="11,0,0">Attach the puller chuck plate to the puller head and tighten the bolts by hand first.</p>
</li>
<li>
<p data-path-to-node="11,1,0"><b data-path-to-node="11,1,0" data-index-in-node="0">Tightening rule:</b> Tighten bolts <b data-path-to-node="11,1,0" data-index-in-node="37">diagonally</b> to ensure even pressure across the contact surfaces.</p>
</li>
</ul>
<h3 data-path-to-node="12">6. Completion</h3>
<ul data-path-to-node="13">
<li>
<p data-path-to-node="13,0,0">Insert the entire screw shaft, with the head attached, into the puller barrel from the rear end.</p>
</li>
<li>
<p data-path-to-node="13,1,0">Apply heat-resistant grease and attach the nozzle to the puller barrel, then tighten it securely with a specialized wrench.</p>
</li>
</ul>
<p data-path-to-node="14">Adhering to the correct installation procedures and using heat-resistant grease will ensure stable machine operation and easy disassembly during subsequent maintenance.</p>
<p><iframe loading="lazy" title="Hướng dẫn thao tác lắp trục vít vào nòng cảo - Haitian VietNam" width="1080" height="608" src="https://www.youtube.com/embed/eZIpKg8cvOI?feature=oembed"  allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" referrerpolicy="strict-origin-when-cross-origin" allowfullscreen></iframe></p>
<p>The post <a href="https://vt.haitianinter.com/tutorial/instructions-for-installing-the-screw-shaft-into-the-barrel-of-the-haitian-ma-series-puller/">Instructions for installing the screw shaft into the barrel of the Haitian MA series puller.</a> appeared first on <a href="https://vt.haitianinter.com">Haitian International</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Some points to note when maintaining Haitian MA series plastic injection molding machines.</title>
		<link>https://vt.haitianinter.com/tutorial/some-points-to-note-when-maintaining-haitian-ma-series-plastic-injection-molding-machines/</link>
		
		<dc:creator><![CDATA[vnmarket]]></dc:creator>
		<pubDate>Wed, 10 Jun 2026 07:15:47 +0000</pubDate>
				<guid isPermaLink="false">https://vt.haitianinter.com/?post_type=tutorial&#038;p=27357</guid>

					<description><![CDATA[<p>1. Exterior and mechanical maintenance General inspection: Visually inspect the machine for any unusual signs such as oil leaks or strange noises coming from the puller barrel and screw shaft. Lubrication and oil filtration system: * Check engine oil and lubricating oil levels. Observe the oil filter pressure gauge; if the needle points to the [&#8230;]</p>
<p>The post <a href="https://vt.haitianinter.com/tutorial/some-points-to-note-when-maintaining-haitian-ma-series-plastic-injection-molding-machines/">Some points to note when maintaining Haitian MA series plastic injection molding machines.</a> appeared first on <a href="https://vt.haitianinter.com">Haitian International</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h3 data-path-to-node="2">1. Exterior and mechanical maintenance</h3>
<ul data-path-to-node="3">
<li>
<p data-path-to-node="3,0,0"><b data-path-to-node="3,0,0" data-index-in-node="0">General inspection:</b> Visually inspect the machine for any unusual signs such as oil leaks or strange noises coming from the puller barrel and screw shaft.</p>
</li>
<li>
<p data-path-to-node="3,1,0"><b data-path-to-node="3,1,0" data-index-in-node="0">Lubrication and oil filtration system:</b> * Check engine oil and lubricating oil levels.</p>
<ul data-path-to-node="3,1,1">
<li>
<p data-path-to-node="3,1,1,0,0">Observe the oil filter pressure gauge; if the needle points to the red mark, the oil filter needs to be replaced immediately.</p>
</li>
</ul>
</li>
<li>
<p data-path-to-node="3,2,0"><b data-path-to-node="3,2,0" data-index-in-node="0">Glue dispensing unit:</b> Clean the nozzle, heating ring, temperature sensor, and check the screw connections.</p>
</li>
<li>
<p data-path-to-node="3,3,0"><b data-path-to-node="3,3,0" data-index-in-node="0">Leveling the machine:</b> Check the balance of the machine frame and adjust the feet if the machine is unbalanced.</p>
</li>
</ul>
<h3 data-path-to-node="4">2. Electrical system maintenance</h3>
<ul data-path-to-node="5">
<li>
<p data-path-to-node="5,0,0"><b data-path-to-node="5,0,0" data-index-in-node="0">Safety:</b> Always turn off the power before cleaning the inside of the electrical cabinet.</p>
</li>
<li>
<p data-path-to-node="5,1,0"><b data-path-to-node="5,1,0" data-index-in-node="0">Cleaning the electrical cabinet:</b> * Use an air hose to clean the ventilation fan and the inside of the cabinet. <b data-path-to-node="5,1,0" data-index-in-node="72">Note:</b> Ensure all moisture is expelled from the air hose before blowing air onto the electrical circuits to avoid short circuits and fires.</p>
<ul data-path-to-node="5,1,1">
<li>
<p data-path-to-node="5,1,1,0,0">Wipe clean with a dry cloth after blowing away the dust.</p>
</li>
</ul>
</li>
<li>
<p data-path-to-node="5,2,0"><b data-path-to-node="5,2,0" data-index-in-node="0">Check connections:</b> Manually inspect the tightness of electrical connections, valve connectors, and any wires connected by the customer.</p>
</li>
<li>
<p data-path-to-node="5,3,0"><b data-path-to-node="5,3,0" data-index-in-node="0">Voltage measurement:</b> Use a multimeter to check the 380V, 220V, and 24V power levels to ensure stability.</p>
</li>
</ul>
<h3 data-path-to-node="6">3. Operational testing and finalization</h3>
<ul data-path-to-node="7">
<li>
<p data-path-to-node="7,0,0"><b data-path-to-node="7,0,0" data-index-in-node="0">Motor:</b> Remove the protective cover to check for oil leaks and listen for unusual noises when the motor is running.</p>
</li>
<li>
<p data-path-to-node="7,1,0"><b data-path-to-node="7,1,0" data-index-in-node="0">Safety system:</b> Check the emergency stop buttons and door limit switches.</p>
</li>
<li>
<p data-path-to-node="7,2,0"><b data-path-to-node="7,2,0" data-index-in-node="0">Additional lubrication:</b> Apply grease to the joints and bearings.</p>
</li>
<li>
<p data-path-to-node="7,3,0"><b data-path-to-node="7,3,0" data-index-in-node="0">Grounding:</b> Inspect the grounding wire to ensure electrical safety for the operator.</p>
</li>
</ul>
<p data-path-to-node="8">Finally, after a final general check, the technician will affix a maintenance sticker to the machine to confirm the completion of the process.</p>
<p><iframe loading="lazy" title="HAITIAN(VIETNAM) - MỘT SỐ ĐIỂM CẦN CHÚ Ý KHI BẢO DƯỠNG MÁY" width="1080" height="608" src="https://www.youtube.com/embed/GR5SD--Qp5w?feature=oembed"  allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" referrerpolicy="strict-origin-when-cross-origin" allowfullscreen></iframe></p>
<p>The post <a href="https://vt.haitianinter.com/tutorial/some-points-to-note-when-maintaining-haitian-ma-series-plastic-injection-molding-machines/">Some points to note when maintaining Haitian MA series plastic injection molding machines.</a> appeared first on <a href="https://vt.haitianinter.com">Haitian International</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
